All considerations of Application, Installation, and Maintenance of submersible motors relate to:
- Operating environment
- Electrical supply
- Cooling flow of water
- Pump load
This manual will acquaint you with these considerations and assist you if service or maintenance is required. To find your way around, click on a topic on the right.
If you're familiar with the AIM manual, use this quick tool to jump directly to the page you need.
Application - Table of Contents
- Storage
- Frequency of Starts
- Mounting Position
- Transformer Capacity
- Effects of Torque
- Engine Driven Generators
- Use of Check Valves
- Well Diameters, Casing, Top Feeding, Screens
- Water Temperature and Flow
- Flow Inducer Sleeve
- Head Loss Past Motor
- Hot Water Applications
- Drawndown Seals
- Grounding Control Boxes and Panels
- Grounding Surge Arrestors
- Control Box and Panel Environment
- Equipment Grounding
- 3-Wire Control Boxes
- 2-Wire Motor Solid State Controls
- QD Relays (Solid State)
- Cable Selection - 2-Wire or 3-Wire
- Two Different Cable Sizes
- Single-Phase Motor Specifications
- Auxiliary Running Capacitors
- Buck-Boost Transformers
- Cable Selection - 60°C Three Wire
- Cable Selection - 60°C Six Wire
- Cable Selection - 75°C Three Wire
- Cable Selection - 75°C Six Wire
- Three-Phase Motor Specifications
- Overload Protection
- Subtrol-Plus
- Power Factor Correction
- Three-Phase Starter Diagrams
- Three-Phase Power Unbalance
- Rotation and Current Unbalance
- Three-Phase Motor Lead Identification
- Phase Converters
- Reduced Voltage Starters
- 8 Inline Booster Pump Systems
- Variable Speed Operation
Installation - Table of Contents
Maintenance - Table of Contents
- System Trouble Shooting
- Preliminary Tests
- Insulation Resistance
- Resistance of Drop Cable
- Identification of Cables
- Single-Phase Control Boxes
- Ohmmeter Tests
- QD Control Box Parts
- Integral HP Control Box Parts
- Control Box Wiring Diagrams
- Pumptec-Plus Trouble Shooting
During Installation - Pumptec-Plus Trouble Shooting
After Installation - QD Pumptec and Pumptec
Trouble Shooting - CP Water Troubleshooting
- SubMonitor Troubleshooting
- Subtrol-Plus Troubleshooting
Get the PDF version of the AIM Manual:
